Highway 290 Expansion Corridor
A fleet of dozers and excavators deployed across 47 miles of right-of-way — clearing, grading, and drainage trenching. Over 12,000 operating hours logged with zero unplanned mechanical downtime.
From 47-mile highway corridors to a single-ranch soil prep campaign — here is a selection of jobs where our equipment made the difference.
These are not renders or proposals — they are completed jobs where our machines were on the ground, and the customers signed off on time.
A fleet of dozers and excavators deployed across 47 miles of right-of-way — clearing, grading, and drainage trenching. Over 12,000 operating hours logged with zero unplanned mechanical downtime.
A 3,200-acre cattle and row-crop operation needed brush clearing, terracing, and deep subsoiling completed before winter wheat planting. All three phases delivered on the agreed schedule.
Excavators and a directional bore unit supplied for underground utility installation on a 480,000 sq ft logistics facility — staged to keep the general contractor on critical-path milestones.
Compact excavator and directional bore coordinated for a 14-mile water main installation across active farmland — completed two weeks ahead of deadline, ahead of a drought-season restriction window.
A wheel loader and twin skid steers handled material staging and precision finish grading along 2.4 miles of mixed-use trail — operating within established oak root protection zones throughout.
Four dozers and a motor grader built 22 miles of all-weather caliche access roads across active drilling pads — repeated 48-hour mobilization windows met without a single missed callout.
Send us the scope and we will recommend a machine, coordinate transport, and get you a timeline.